1.What is the typical lead time for a custom structural frame prototype?
Prototypes typically take 2-4 weeks after final drawing approval and DFM review. Mass production lead times are scaled to your volume.
2.Can you handle the assembly of fluid or electrical components onto the frame?
Yes. As a turnkey central manufacturing hub, we can integrate hydraulic pipelines, reservoirs, and wire harnesses directly into your structural frames before shipping.
3.What quality validation reports do you provide?
Upon request, we supply CMM dimensional reports, material certificates, and weld penetration analysis (metallography and hardness) to ensure seamless global OEM factory audits.
4. Manufacturing & Inspection Basis
Production strictly follows ISO 3834 international welding standards, overseen by IWE-certified engineers. Dimensional accuracy is validated using Zeiss CMM metrology, while material strength and weld integrity are verified through in-house metallographic analysis and Brinell/Knoop hardness testing.
5. How to Inquire
To get a fast and accurate quote, please prepare your 3D CAD models (STEP/IGS), 2D drawings with tolerance notes, expected order quantity, and specific application loads. Submit your files via our Contact Us form for a free DFM (Design for Manufacturing) review.